Is your server room really "sealed"?

Data centers are the digital heart of enterprises. To protect expensive IT equipment, clean gas fire suppression systems such as heptafluoropropane, IG541, etc. have become standard.

However, a fatal issue that most owners overlook is this: after the extinguishing gas is discharged, if the enclosure cannot maintain sufficient airtightness, the extinguishing agent will dissipate within minutes — and the fire will re-ignite.

In server rooms dense with cable trays and numerous wall-penetrating pipes, "leakage" and "fire compartmentation failure" are the most concealed and most dangerous safety blind spots of data centers.

Pain point straight to the core: compliant materials ≠ compliant system

Many owners purchase FM/UL-certified firestop putty and fire-resistant boards and assume "all is well."

The reality is otherwise: the effectiveness of firestopping depends on a complete closed loop of "Design → Installation → Inspection → Maintenance" (DIIM). Any small human deviation in the installation phase — incorrect annular clearance, insufficient fill depth — can render an entire fire barrier ineffective during a fire. You can buy compliant materials, but you can't buy a compliant system.

Solution: TKC four-step one-stop closed-loop delivery

To thoroughly solve the industry's chronic problem of "someone performs the work, no one takes responsibility," Shanghai Tengxi (TKC) launched a four-step closed-loop delivery solution: "Testing → Diagnosis → Repair → Verification":

Step2|Airtightness Testing and Problem Diagnosis

  • Envelope airtightness testing (DoorFanTest): strictly in accordance with NFPA 2001 / FM 5-32, using bidirectional positive and negative pressurization, combined with a smoke generator and infrared thermal imaging to precisely locate leak points
  • RetentionTime calculation: precisely compute the effective RetentionTime of the extinguishing agent, ensuring the gas remains effective during the critical 10 minutes
  • Professional diagnostic report: clearly present the distribution of leak points and a checklist of missing seals, providing a precise basis for subsequent repairs

Step4|FM-certified remedial construction and results verification

As one of the very few firestop contractors in Asia certified to FM 4991, TKC comprehensively rectifies every detected defect:

  • DRI expert-led: each seal is personally overseen by a designated responsible individual (DRI) who has passed FM's rigorous assessment, ensuring installation methods precisely match the certified detail drawings
  • Fully traceable records: each location generates an independent "identity file" — site photos, GPS coordinates, material batch numbers all included — ready for insurance and audit checks at any time
  • Post-delivery re-test: airtightness testing is performed again after construction completion to demonstrate the effectiveness of repairs through a data closed loop

One-sentence summary

Choosing an FM-certified contractor is essentially purchasing a quality assurance system endorsed by an international third party. Don't let the safety of your data center be ruined by an inconspicuous gap.