TKC-20GP / 20HC9 Standard ModelsA / B · DLC · C

Fire-Resistant &
Explosion-Venting
Container House Series

A modular solution for hazardous-material storage and personnel refuge. Three product series cover fire-isolated storage, explosion-venting fire-rated storage, and temporary personnel shelter.

TKC explosion-venting fire-rated container unit
Original product image from the technical brief
Product Series Overview

Three Series for Fire Protection, Venting, and Personnel Refuge

The product range uses two base container types—20GP and 20HC—and comprises nine standard models.

Fire-Rated Container Units
A / B

Fire-Rated Container Units

For fire-isolated storage of combustible materials and equipment. All sides and the ceiling use 120 mm fire walls, paired with a fire door or fire roller shutter.

Explosion-Venting Fire-Rated Container Units
DLC

Explosion-Venting Fire-Rated Container Units

For storage of flammable chemicals with deflagration risk. Uses fire blast walls and a lightweight venting wall; the venting configuration uses TKC-01 fasteners and restraint cables, subject to project technical documentation.

Personnel Shelter
C

Personnel Shelter

For temporary refuge near explosion-hazard areas. All sides and the ceiling use fire blast walls, paired with a fire blast door and no venting surface.

Base Units & Model Coding

Two Base Units, One Model Logic

20GP Standard Unit

6058×2438×2591 mm · For A / B / DLC-A / DLC-B / C models

20HC High-Cube Unit

6058×2438×2896 mm · DG hazardous-material unit with standard sump; for A / B / DLC-A / DLC-B models

A

Hinged door at short-end B2

B

Fire roller shutter at long-side A2 for forklift/full-pallet access

C

20GP-only personnel shelter

DLC

Explosion-venting models configured with a venting wall

Core Construction

120 mm Fire Blast Wall with Project-Specific Venting Surface

A / B / DLC / C models share the 120 mm fire blast wall construction. A / B models use fire doors without blast design; final fire resistance is determined by project requirements.

120

mm wall thickness

2.5–3

h fire resistance

1Outer corrugated panel1.6 mm
2Q235B steel frame100×100×3 mm
3Rock wool100 mm · 120 kg/m³
4Ceramic wool10 mm · 128 kg/m³
5Inner stamped blast plate9.5 mm
DLC Venting Configuration

Lightweight Relief Surface for Directional Release of Deflagration Pressure

  • Venting wall: 0.6 mm single-skin profiled steel panel YX12-110-880, 50 mm foil-faced glass wool, and Q235B steel framing.
  • Venting hardware: TKC-01 venting fasteners (700 N break force) with TKC-JS900 restraint cables; fastener/cable layout and installation controls must follow the project venting design.
  • Venting area must be calculated case by case against the stored medium and net enclosure volume under GB 50016 or FM DS 1-44. DLC is a project configuration; do not describe the complete container unit as an FM-certified product.
Door Systems

Three Door Types for Function and Operating Method

Door typeFire resistanceBlast resistance20GP size20HC sizeApplication
Fire door≥1.5 h—2010×2170 mm2010×2420 mmTKC-20GP-A / 20HC-A
Fire blast door≥1.5 h300 kPa2010×2170 mm2010×2420 mmDLC-A, TKC-20GP-C
Fire roller shutter≥3 hDLC-B additionally rated 1 MPa blast5600×2170 mm5800×2650 mmB models
TKC fire roller-shutter container unit

Project-Specific Door System for DLC-B Models

Confirm both the standard door-system table and the exact model configuration against the project design. The standard configuration for TKC-20HC-DLC-B uses a 5600×2400 mm fire roller shutter.

Model Configuration Table

Nine Standard Models

Areas are reference configuration areas for fire/blast walls and venting walls; the final project follows the formal technical proposal and contract.

ModelBaseFire/blast wall m²Venting wall m²DoorDoor position
TKC-20GP-A20GP42.48—Fire door 2010×2170 mmShort end B2
TKC-20GP-B20GP34.46—Fire roller shutter 5600×2170 mmLong side A2
TKC-20GP-DLC-A20GP29.6612.82Fire blast door 2010×2170 mmShort end B2
TKC-20GP-DLC-B20GP29.664.80Fire roller shutter 5600×2170 mmLong side A2
TKC-20GP-C20GP42.48—Fire blast door 2010×2170 mmShort end B2
TKC-20HC-A20HC46.52—Fire door 2010×2420 mmShort end B2
TKC-20HC-B20HC37.44—Fire roller shutter 5800×2650 mmLong side A2
TKC-20HC-DLC-A20HC32.0014.52Fire blast door 2010×2420 mmShort end B2
TKC-20HC-DLC-B20HC32.005.44Fire roller shutter 5600×2400 mmLong side A2
DLC-A: Both 20GP and 20HC configurations use 42 fastener sets and 14 restraint-cable sets.
DLC-B: Both 20GP and 20HC configurations use 18 fastener sets and 6 restraint-cable sets.
Selection Guide

Select by Storage Risk and Operating Method

The following are selection directions from the technical brief. Actual selection still requires confirmation of the stored medium, quantity, site conditions, and venting area.

01Fire-isolated storage for general combustible materials and equipment
A / B models
02Storage of flammable liquids, paint thinners, and other materials with deflagration risk
DLC models
03Temporary personnel refuge near explosion-hazard areas
C model
04Forklift or full-pallet access required
B models (long-side roller shutter)
05Leakage collection required
20HC models (standard sump)
20HC container unit sump grating floor
Options & Customization

Project Options for Liquid Collection, Access, and Site Conditions

  • 20HC units, including DLC models, have a 2,400 L effective sump volume: the upper grating provides the working surface, leaked liquid flows to a liquid-tight lower sump, and the drain remains closed in normal operation.
  • Mobile ramp: effective width 2,200 mm, main length 1,500 mm, and reference weight approximately 420 kg.
  • Customizable items include doors and openings, venting-surface configuration, sump and drainage, and exterior coating; flood height for an integrated flood barrier is confirmed project by project.
Delivery Process

From Requirement Confirmation to Site Acceptance

01

Requirement Confirmation

Stored medium, quantity, and site conditions

02

Configuration & Calculation

Model selection and vent-area calculation

03

Factory Prefabrication

Integration of walls, doors, and venting system

04

Inspection & Transport

Factory inspection and whole-unit lifting/transport

05

Positioning & Acceptance

Site positioning and handover documentation

The configurations shown are standard models; each project is subject to the formal technical proposal and contract.

TKC-20GP / 20HC

Confirm a Container-House Solution for Your Stored Medium and Site

Share the stored medium, quantity, site conditions, and operating method. TKC can help confirm the model, vent-area calculation, and project-specific options.