FM 4991 Certified Contractor — One of Very Few in Asia

Fire compartmentation is the core mechanism of passive fire protection — TKC takes responsibility for the safety of every firestop node with FM 4991 certification

FM 4991ILAC MRAUL3MHilti
FM 4991

What FM 4991 Certification Means

FM 4991 is a certification of firestop-contractor capability. It does not make a firestop service or material a blanket FM product-certification claim; materials and systems still require confirmation against project specifications, applicable tested systems, and product documentation.

Asia Market Reality

FM 4991 and FM 4440 cover different capability areas: the former concerns a firestop contractor, while the latter relates to venting systems and relevant certified products. TKC presents them separately to avoid conflating firestop engineering with explosion-protection products.

TKC Firestop Engineer

Material & System Selection

Materials and systems selected against project specifications, applicable tested systems, penetration conditions, and product documentation

Method Application

Installation follows the applicable system instructions and project technical requirements, with construction records retained

Construction Management

FM 4991 certified construction management system, full control from material arrival to completion

Archive Management

Traceable tags + construction archive, every node traceable and verifiable

Audit Documentation Basis

Contractor capability, node tags, installation photographs, and third-party reports can support technical review by owners or insurers

Rare in Asia

One of very few FM 4991 certified firestop contractors in Asia

Services

Four Core Services

01

FM 4991 Certified Firestop Engineering

TKC delivers construction management through its FM 4991 firestop-contractor capability. Materials and firestop systems are selected against project specifications, applicable tested systems, and technical documentation.

FM 4991System SelectionConstruction Management
02

Fire Compartmentation Integrity Testing

Using ILAC MRA accredited laboratory equipment to conduct airtightness testing on building enclosures, quantitatively assessing fire compartmentation integrity and issuing third-party recognized reports.

ILAC MRAAirtightness TestingThird-Party Report
03

Test-Diagnose-Repair-Verify Closed Loop

One organization, from problem discovery to result delivery. TKC leads the entire process: on-site testing → defect diagnosis → firestop repair → re-verification, delivering directly verifiable results.

One-StopClosed LoopVerifiable Results
04

Traceable Tag Archive System

Every firestop node is equipped with a traceable tag, establishing a complete construction archive supporting FM insurance audits, project completion acceptance, and subsequent maintenance management.

TraceableConstruction ArchiveInsurance Audit
One-Stop Closed Loop

"Test—Diagnose—Repair—Verify" One-Stop Closed Loop

One organization, from problem discovery to result delivery. Clients only need one call.

Test

On-site airtightness testing, quantitative assessment of fire compartmentation integrity

Diagnose

Defect location and analysis, identifying firestop failure nodes and causes

Repair

Firestop repair implemented against the project’s applicable system, installation instructions, and site conditions

Verify

Re-verification testing, issuing ILAC MRA recognized third-party report

Service Scope

Firestop Node Type Coverage

Cable Penetrations
Pipe Penetrations
Duct Penetrations
Mixed Penetrations
Construction Joints
Fire Door Frame Gaps
Curtain Wall-Floor Joints
Fire Compartment Wall Openings
Official Certification

FM 4991 Certificate of Compliance

FM 4991 Certificate of Compliance - Shanghai Tengxi Construction Eng Co Ltd
FM Approved

FM Approvals

Class 4991

Firestop Contractor Certification

Certified Company

Shanghai Tengxi Construction Eng Co Ltd

Approval Identification

PR449887, RR245394

Approval Granted

10 April 2025

FM 4991 is a firestop-contractor capability certification issued by FM Approvals. This website presents FM 4440 venting-system capability and FM 4991 firestop-engineering capability separately, and each should be verified against its respective scope.

Material & System Selection Basis

Actual materials and firestop systems are confirmed against project specifications, applicable tested systems, product data, and installation instructions.

Project specification
Applicable tested system
Product data
Installation instructions
Site conditions
Completion records
FM Approved Firestop Material System

JH607 + JH608

Elastomeric Firestop Sealant + Firestop Coated Board · FM Approved Design No. 790 · For cable penetrations through concrete walls and floor slabs

3 HR
F Rating
1.75 HR
T Rating
3 HR
TFM Rating
180 min
GB Fire Test
Design No. 790
FM Approved

FM Certified System Parameters

FM StandardFM Approval Standard 4990
FM System No.Design No. 790
System TypeWall & Floor Slab Cable Penetration Firestop System
SubstrateConcrete wall or concrete floor slab
Min. Substrate Thickness200 mm (7.8 in.)
Penetrating ItemsCables or cable trays
Listing CountryChina
Approval TypeFM Approved

Ratings per ASTM E814 + E2226 tests. Opening dimensions, number of penetrants, cable fill ratio, board layers, joint width, and sealant thickness must strictly follow FM Approved Design No. 790 installation drawings.

Installation Key Steps (7-Step Method)

01
Board CuttingMark penetrant positions on board, cut to fit opening
02
Penetrant CoatingApply intumescent or elastomeric sealant to penetrant contact surfaces
03
Perimeter CoatingApply elastomeric sealant around opening perimeter and board perimeter
04
Flush InstallationPush board flush with substrate, seal edges with elastomeric sealant
05
Gap FillingFill remaining voids with mineral wool, then seal with sealant
06
Coating ThicknessFirestop coating 0.5 mm dry film per side, total ≥1 mm
07
Penetrant CoatingApply coating 200 mm on each side of penetrants (including tray members)
Installation notes: Backing mineral wool density >100 kg/m³; walls require filling from both sides, floors from one side only; do not disturb joints within 48 hours of installation.

System Material Specifications

JH608
Firestop Coated Board
CN Certified Name: Firestop Board
CN Certified ModelDCK-Z-FDL-EIC3-JH608
Dimensions1200 × 600 × 50 mm
Core MaterialMineral Wool Board
Mineral Wool Density180 kg/m³
Surface MaterialDecorative Firestop Coating
Coating Fineness< 90 μm
CN Fire Cert. No.Z2024081809001520
Type Test ReportGn202403055
Certificate Validity2024-12-16 to 2029-12-15

Key Features

Mineral wool core with double-sided decorative firestop coating
Low density, lightweight — easy to transport and install
Intumescent on fire exposure; non-toxic, halogen-free gas release
JH607
Elastomeric Firestop Sealant
CN Certified Name: Firestop Sealant
CN Certified ModelDJK-Z-FDL-EIC3-JH607
Package300 mL / cartridge
System RoleSealant for Design No. 790 system
Primary UseBoard joints, perimeter gaps, penetrant sealing
Elongation> 20%
CN Fire Cert. No.Z2024081809001527
Type Test ReportGn202403059
Certificate Validity2024-12-16 to 2029-12-15

Key Features

Single-component water-based, low modulus — good flexibility and adhesion
Forms dense network structure on fire exposure, blocking flame and heat transfer
Halogen-free and sulfur-free; watertight, smoke-tight, non-toxic smoke
Elongation >20%; resistant to nuclear radiation, LOCA, and decontaminants

GB 23864-2023 National Standard Test Data

Testing Authority: Tianjin Fire Research Institute, MEM · National Quality Inspection Center for Fixed Fire Extinguishing Systems and Fire-Resistant Components (CMA · CNAS L0988 · ilac-MRA)

JH608
Type Test Report Gn202403055
Test ItemResultPass
Flexural Strength0.30 MPa (req. ≥0.10)✓
Water Resistance3 d, no swelling or cracking✓
Moist Heat Resistance120 h, no cracking or powdering✓
Freeze-Thaw Cycles15 cycles, no cracking or powdering✓
Combustion PerformanceClass B₂ (E)✓
Smoke ToxicityClass ZA₂✓
Air Permeability0.1 m³/(m²·h) (limit ≤3.5)✓
Fire Integrity180 min — integrity maintained✓
Fire Insulation180 min, max temp rise 157.8°C✓
Hose StreamNo water flow holes formed✓
JH607
Type Test Report Gn202403059
Test ItemResultPass
Apparent Density1.5×10³ kg/m³ (limit ≤2.0×10³)✓
Corrosion7 d, no rust or corrosion✓
Water Resistance3 d, no swelling or cracking✓
Acid / Alkali Resistance3 d, no swelling or cracking✓
Moist Heat Resistance360 h, no cracking or powdering✓
Freeze-Thaw Cycles15 cycles, no cracking or powdering✓
Combustion PerformanceClass B₂ (E)✓
Smoke ToxicityClass ZA₂✓
Air Permeability0.7 m³/(m²·h) (limit ≤3.5)✓
Fire Integrity180 min — integrity maintained✓
Fire Insulation180 min, max temp rise 102.7°C✓
Hose StreamNo water flow holes formed✓

Fire Performance Margin Comparison (180 min Test)

JH607Max rise 102.7°C, margin 77.3°C
0°CGB limit 180°C
JH608Max rise 157.8°C, margin 22.2°C
0°CGB limit 180°C

Both products achieved 180 min fire integrity and insulation. No water flow holes after hose stream test. JH607 has larger temperature margin, suitable for locations with higher insulation requirements.

Certification & Traceability

ItemJH607JH608
FM System DesignDesign No. 790Design No. 790
FM StandardFM Approval Standard 4990FM Approval Standard 4990
FM Certificate No.PR461358PR461358
CN Certified Product NameFirestop SealantFirestop Board
CN Certified ModelDJK-Z-FDL-EIC3-JH607DCK-Z-FDL-EIC3-JH608
CN Fire Cert. No.Z2024081809001527Z2024081809001520
Type Test Report No.Gn202403059Gn202403055
CN StandardGB 23864-2023GB 23864-2023
Certificate Validity2024-12-16 to 2029-12-152024-12-16 to 2029-12-15
Supply / System ContractorShanghai Tengxi Construction Eng Co Ltd (TKC)Shanghai Tengxi Construction Eng Co Ltd (TKC)

Design No. 790 System Applications

Cable Through Concrete Fire Walls

Single cables or cable bundles penetrating concrete wall openings

Cable Tray Through Fire Barriers

Cable tray penetrations through concrete fire separation members

Switchrooms / Substations

Cable penetration sealing in switchrooms and substations

Data Center Electrical Rooms

Penetration sealing in data center electrical rooms

Industrial Facilities

Cable mezzanines and cable shaft penetrations

Applicable conditions: All locations must comply with FM Approved Design No. 790 installation drawing requirements: concrete substrate, minimum thickness 200 mm, penetrating items are cables or cable trays.

TKC Service Model
01

TestInspect

02

DiagnoseAnalyze

03

RepairFix

04

VerifyConfirm

Learn About Full Service Process

Start with a Free Safety Assessment

Speak with TKC's certified engineers for a systematic evaluation of your explosion protection and firestop systems against FM Global standards. We serve clients across China and Asia.